From Prototype to Production

Best practices for taking stainless steel parts from prototype to full production.
prototype-to-production

Best Practices for Stainless Steel Part Fabrication

Transitioning stainless steel parts from prototype to full-scale production requires more than just repeating the same steps at a larger volume. Success depends on design for manufacturability, structured prototyping, careful material selection, and consistent quality assurance. With the right approach, you can minimise costs, avoid delays, and produce reliable parts at scale.

At Datum, we’ve built our workflow around these principles, ensuring customers receive high-quality parts from the first prototype to final production.

Design & Prototyping Best Practices

Getting the design right upfront sets the tone for the entire workflow. Early collaboration and smart design decisions make parts easier and more cost-effective to manufacture.

  • Collaborate early: We work with customers using CAD drawings from the start, ensuring the design is optimised for cost effective production.
  • Lead-In’s: Our engineers apply lead-ins as a standard practice because they allow the laser to pierce and stabilise outside the part profile, ensuring cleaner edges, reduced heat distortion, and higher cut accuracy.
  • Design with adequate clearance: Identify and correct spacing issues that could cause challenges later.
  • Choose the right material and processes: Based on the application, Datum helps select the proper grade of material and manufacturing technologies, CNC machining, laser cutting or stamping for the production scale.

Material Selection and Test Runs

The choice of stainless steel directly impacts performance, durability, and manufacturability. Conducting tests with the final product ensures that your chosen material responds well to postproduction processes.

  • Run pilot batches to validate cutting and finishing.
  • Refine settings to optimise efficiency and reduce scrap.
  • Confirm material properties like corrosion resistance and strength for the intended application.

Small-scale trials reduce risk, helping customers transition smoothly to large-scale production.

Scaling to Production While Maintaining Quality

Datum ensures efficiency and consistency by carefully scaling from prototype to production.

  • Standardise process parameters: Cutting speeds and finishing techniques are maintained across batches.
  • Pilot production runs: Validate processes before moving into high-volume manufacture.
  • Batch tracking: Produce in smaller runs first to detect issues without impacting the full order.

Quality Assurance Checkpoints

Quality control at Datum is integrated into every stage of manufacture, not just at the end.

  • Incoming inspections: Verify raw materials for grade and condition.
  • In-process checks: Monitor critical dimensions and surface finishes during production.
  • Dimensional reporting: The CMM is used to measure the geometry of our parts for precision

Datum’s layered quality assurance approach helps minimise defects and maintain customer confidence.

Streamlining from Prototype to Production

To transition successfully from prototype to production for stainless steel, Nickel or Nickel plated Steel parts:

  • Focus on design for manufacturability with simplified geometry, standard thicknesses, and prioritised tolerances.
  • Leverage early CAD collaboration and prototyping to refine designs and prevent costly fixes.
  • Conduct pilot runs and continuous monitoring to validate processes before scaling.
  • Build quality assurance checkpoints into the entire workflow.

At Datum, these best practices aren’t just guidelines they are the foundation of our production process. By following them consistently, we help customers move from concept to finished stainless steel parts with confidence, efficiency, and long-term reliability.